Renewable Energy Member Associations

REMA Safety Guidelines
Safety Guidelines

Solar Installation
Safety Standards

Guidelines & Measures Taken by the Project Team — in full compliance with Indian safety norms including CEA Regulations, BIS Standards, Electricity Act 2003 & OSH Code 2020.

Presented by REMA — Renewable Energy Manufacturers Association

Indian Safety Norms & Regulatory Framework

All solar installation activities are carried out in strict compliance with the following Indian regulations and standards.

CEA Safety Regulations, 2010

Governs safe design, erection & operation of electrical plants, including solar PV systems.

Electricity Act, 2003

Statutory framework for electrical safety, earthing & protection systems across all installations.

BIS / IS Standards for Solar PV

IS 16270, IS 16221, IS/IEC 61730 — module, cable & system safety requirements.

Factories Act, 1948 & OSH Code, 2020

Occupational health, safety & working conditions for all site personnel.

National Building Code (NBC) 2016

Fire safety, structural & rooftop installation safety provisions.

IS 3521 / IS 3764 — Height Safety

Standards for fall-arrest harnesses, scaffolding & working at height protection.

Personal Protective Equipment (PPE)

Mandatory PPE kit issued to every worker before entering the solar installation site, as per Factories Act, 1948 & OSH Code, 2020.

Safety Helmet

Protects against falling objects & head impact on rooftops and ground-mount sites.

Safety Goggles

Shields eyes from glare, dust & debris during drilling and panel handling.

Insulated Hand Gloves

Electrical-grade gloves for cable termination & module wiring tasks.

Safety Shoes

Steel-toe, anti-slip footwear for rooftop & rough terrain movement.

Full-Body Safety Harness

Fall-arrest harness with lifeline for all rooftop & height work (IS 3521).

Hi-Visibility Reflective Vest

Ensures worker visibility at all times across the active work zone.

Electrical Safety & Working at Height

DC & AC side electrical hazards and rooftop fall risks are controlled through these structured measures.

Electrical Safety Measures

  • Lock-Out / Tag-Out (LOTO): Strings & inverters isolated and tagged before any wiring or maintenance work begins.
  • DC Isolation & Polarity Check: Each string isolated and polarity / voltage verified before connection to combiner box.
  • Earthing & Grounding: All module frames, structures & combiner boxes earthed as per IS 3043.
  • Insulated Tools & Test Equipment: Only IS-certified insulated tools and calibrated multimeters / clamp meters used.
  • RCD / ELCB Protection: Residual current devices installed on AC distribution to prevent earth-leakage shocks.
  • Hazard Signage & Labeling: Danger / live-circuit labels placed at panels, junction boxes & inverter rooms.

Working at Height Safety

  • Certified Anchor Points & Lifelines: Roof anchors load-tested before use; double-lanyard harness for movement between points.
  • Guardrails, Toe Boards & Edge Protection: Perimeter guardrails and toe boards installed along all open rooftop edges.
  • Scaffold & Access Equipment Inspection: Daily tag-based inspection of scaffolding, ladders & mobile platforms before use.
  • Weather-Based Work Restrictions: Height work suspended during high wind (>30 km/h), rain, or lightning conditions.

Fall Protection First

Every worker on a rooftop or elevated structure is secured to a certified anchor point at all times — zero unprotected exposure above 1.8 m, as per IS 3764.

Fire & Emergency Preparedness

Fire risks from DC arcing, cabling & hot work are managed proactively at every solar installation site.

01

Fire Extinguishers

CO2 / ABC / DC-rated extinguishers placed near inverter rooms, combiner boxes & switch yards; checked monthly.

02

Arc-Fault & DC Fault Protection

AFDD-enabled inverters and fuse protection on all DC strings & combiner boxes to prevent arc-fault fires.

03

Hot-Work Permit System

Permit-to-work required for any cutting, grinding or welding near panels and cabling infrastructure.

04

Emergency Evacuation Plan

Marked evacuation routes & assembly points displayed at every work zone for rapid response.

05

Cable Management & Segregation

DC and AC cables routed separately, secured in conduits to prevent abrasion, shorting & fire hazards.

06

Fire Mock Drills

Periodic fire & emergency drills conducted with the full site team to ensure readiness at all times.

Team Training, Site Safety & Housekeeping

Beyond equipment and signage, our team follows a structured safety culture across every shift — keeping the site clean, organized and hazard-free.

1

Daily Toolbox Talks

Every shift begins with a 10-minute briefing on task-specific hazards & controls.

2

Permit-to-Work System

Work permits issued & verified for height, electrical and hot-work activities.

3

Daily Safety Inspections

Site Safety Officer conducts walk-through inspections of tools, PPE & access equipment.

4

Certified, Trained Workforce

Riggers, electricians & supervisors hold valid safety training certifications.

5

Near-Miss & Incident Reporting

Open reporting culture for hazards & near-misses, reviewed in daily meetings.

6

Barricading & Warning Signage

Active work zones cordoned off with barricades, caution tape & warning boards.

7

Tool & Material Storage

Organized storage for tools, cables & modules to prevent clutter and trip hazards.

8

Waste Segregation & Disposal

Segregated bins for e-waste, packaging & general waste, disposed per norms.

Safety Compliance Checklist

Snapshot of key safety measures implemented and verified on every REMA installation site.

# Safety Parameter Status Remarks
1 PPE compliance (helmet, gloves, shoes, harness, vest) Implemented Verified daily at site entry
2 Electrical isolation (LOTO) before wiring / maintenance Implemented Logged in LOTO register
3 Earthing of structures, frames & combiner boxes Implemented Tested as per IS 3043
4 Fall-arrest harness use on rooftop / height work Implemented 100% tie-off above 1.8 m
5 Fire extinguishers at inverter & DC combiner areas Implemented Checked monthly
6 Daily toolbox talk & permit-to-work Implemented Recorded in site log book
7 Barricading & signage of active work zones Implemented Reviewed each shift
8 First aid kit & emergency contacts displayed Implemented Updated at site office

Safety First. Solar Forever.

REMA is committed to upholding the highest standards of occupational, electrical and fire safety — in full compliance with India's safety norms — on every solar installation project.